HWY STATE AVE over WATER QUABOAG RIVER

AT PALMER LINE · County 013, Massachusetts · Built 1929 · 2 Lanes · 3,103 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
M2700715TMUNNBI
Year Built
1929
Length
38.2 m (125.3 ft)
Max Span
12.6 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
3,103
Material
Concrete Continuous
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$6,524,000
Total Project Cost
$9,787,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.