ST 32 PALMER RD over WATER QUABOAG RIVER

AT PALMER TL · County 013, Massachusetts · Built 1924 · 2 Lanes · 9,828 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
M270081A0DOTNBI
Year Built
1924
Reconstructed
1951
Length
32.4 m (106.3 ft)
Max Span
14.8 m
Width
17.2 m (56.4 ft)
Lanes
2
Daily Traffic
9,828
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,685,000
Total Project Cost
$5,528,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.