HWY STATE HSP RD over WATER QUABOAG STREAM

500 EAST OF UPPER PALMER · County 013, Massachusetts · Built 1940 · 1 Lanes · 388 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
M27051179STANBI
Year Built
1940
Reconstructed
1999
Length
12.1 m (39.7 ft)
Max Span
4.9 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
388
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$2,106,000
Total Project Cost
$3,160,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.