ST123 W MAIN ST over WATER WADING RIVER

IN CHARTLEY · County 005, Massachusetts · Built 1999 · 2 Lanes · 17,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N23002ACXDOTNBI
Year Built
1999
Length
11.3 m (37.1 ft)
Max Span
9.8 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
17,800
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$449,000
Total Project Cost
$674,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.