HWY RESERVOIR ST over WATER RUMFORD RIVER

1 MI N OF RTE 140 · County 005, Massachusetts · Built 1955 · 2 Lanes · 4,525 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N230103JMMUNNBI
Year Built
1955
Length
17.7 m (58.1 ft)
Max Span
10.1 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
4,525
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,206,000
Total Project Cost
$1,810,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.