I 495 NB over WATER CANOE RIVER

.2 MI NW OF 123 · County 005, Massachusetts · Built 1978 · 3 Lanes · 42,592 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
N230353RLDOTNBI
Year Built
1978
Length
15.8 m (51.8 ft)
Max Span
14.9 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
42,592
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,920,000
Total Project Cost
$2,881,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.