I 495 NB over WATER LOWER CANOE RIVER

JUST SO OF 123 OVERPASS · County 005, Massachusetts · Built 1978 · 3 Lanes · 42,031 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
N230363RPDOTNBI
Year Built
1978
Length
14.6 m (47.9 ft)
Max Span
13.4 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
42,031
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$445,000
Total Project Cost
$668,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.