ST140 S MAIN ST over WATER RUMFORD RIVER
.37 MI. NO. OF NORTON TL. · County 005, Massachusetts · Built 1928 · 4 Lanes · 28,429 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
41.996067, -71.210672
This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 98 years old.
Nearby Bridges
ST140 S MAIN ST over I 495
Built 1978
I 495 SB & ON RAMP over WATER RUMFORD RIVER
Built 1978
I 495 NB & RAMP E over WATER RUMFORD RIVER
Built 1978
ST140 over I 495
Built 1978
HWY RESERVOIR ST over WATER RUMFORD RIVER
Built 1955
HWY N WSHNGTN ST over I 495
Built 1978
I 495 SB over HWY SCHOOL ST
Built 1978
I 495 NB over HWY SCHOOL ST
Built 1978
HWY SCHOOL ST over RR AMTRAK/MBTA
Built 2004
I 495 SB over COMB FORBS//AMTRAK/MBTA
Built 1978
Bridge Details
- Structure #
- M030133P2DOTNBI
- Year Built
- 1928
- Reconstructed
- 1993
- Length
- 15.2 m (49.9 ft)
- Max Span
- 13.4 m
- Width
- 24.8 m (81.4 ft)
- Lanes
- 4
- Daily Traffic
- 28,429
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,577,000
- Total Project Cost
- $3,866,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.