ST140 over I 495
2.2 MI. S.E. OF I-95 · County 005, Massachusetts · Built 1978 · 4 Lanes · 16,100 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.006528, -71.224461
This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 48 years old.
Nearby Bridges
I 495 SB over HWY SCHOOL ST
Built 1978
I 495 NB over HWY SCHOOL ST
Built 1978
I 495 NB & RAMP E over WATER RUMFORD RIVER
Built 1978
I 495 SB & ON RAMP over WATER RUMFORD RIVER
Built 1978
HWY SCHOOL ST over RR AMTRAK/MBTA
Built 2004
I 495 SB over COMB FORBS//AMTRAK/MBTA
Built 1978
I 495 NB over COMB FORBS//AMTRAK/MBTA
Built 1978
ST140 S MAIN ST over I 495
Built 1978
ST140 over RR AMTRAK/MBTA
Built 1980
ST140 S MAIN ST over WATER RUMFORD RIVER
Built 1928
Bridge Details
- Structure #
- M030313P4DOTNBI
- Year Built
- 1978
- Length
- 128 m (419.9 ft)
- Max Span
- 38.4 m
- Width
- 29.6 m (97.1 ft)
- Lanes
- 4
- Daily Traffic
- 16,100
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,898,000
- Total Project Cost
- $17,848,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.