I 495 NB & RAMP E over WATER RUMFORD RIVER
.1 MI SW OF OLD ST 140 · County 005, Massachusetts · Built 1978 · 6 Lanes · 66,093 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.001942, -71.214744
This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 48 years old.
Nearby Bridges
I 495 SB & ON RAMP over WATER RUMFORD RIVER
Built 1978
ST140 S MAIN ST over I 495
Built 1978
ST140 S MAIN ST over WATER RUMFORD RIVER
Built 1928
ST140 over I 495
Built 1978
I 495 SB over HWY SCHOOL ST
Built 1978
I 495 NB over HWY SCHOOL ST
Built 1978
HWY SCHOOL ST over RR AMTRAK/MBTA
Built 2004
I 495 SB over COMB FORBS//AMTRAK/MBTA
Built 1978
I 495 NB over COMB FORBS//AMTRAK/MBTA
Built 1978
ST140 over RR AMTRAK/MBTA
Built 1980
Bridge Details
- Structure #
- M030323RFDOTNBI
- Year Built
- 1978
- Length
- 15.5 m (50.9 ft)
- Max Span
- 14.6 m
- Width
- 57 m (187 ft)
- Lanes
- 6
- Daily Traffic
- 66,093
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,842,000
- Total Project Cost
- $4,264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.