I 495 SB & ON RAMP over WATER RUMFORD RIVER

.1 MI SW OF OLD ST 140 · County 005, Massachusetts · Built 1978 · 6 Lanes · 44,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
M030323REDOTNBI
Year Built
1978
Length
15.5 m (50.9 ft)
Max Span
14.6 m
Width
35.1 m (115.2 ft)
Lanes
6
Daily Traffic
44,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,750,000
Total Project Cost
$2,626,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.