HWY ELM ST over RR AMTRAK/MBTA

.3 MI SE OF SCHOOL ST. · County 005, Massachusetts · Built 2005 · 2 Lanes · 13,836 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
M03015AMCDOT634
Year Built
2005
Length
52.8 m (173.2 ft)
Max Span
24.3 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
13,836
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$744,000
Total Project Cost
$1,117,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.