HWY GILBERT ST over RR AMTRAK/MBTA

.6 MI NW OF NORTON T.L. · County 005, Massachusetts · Built 1876 · 2 Lanes · 2,072 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
M0300740FDOT634
Year Built
1876
Reconstructed
1997
Length
14.2 m (46.6 ft)
Max Span
13.6 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,072
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,566,000
Total Project Cost
$2,350,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.