ST123 E MAIN ST over WATER RUMFORD RIVER
.8 MI NE OF ST 140 · County 005, Massachusetts · Built 1958 · 2 Lanes · 10,786 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
41.973006, -71.174803
This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 68 years old.
Nearby Bridges
I 495 RAMP B over WATER CANOE RIVER
Built 1978
ST123 E MAIN ST over WATER CANOE RIVER
Built 1978
I 495 SB over WATER LOWER CANOE RIVER
Built 1978
ST123 E MAIN ST over I 495
Built 1978
I 495 NB over WATER LOWER CANOE RIVER
Built 1978
I 495 SB over WATER CANOE RIVER
Built 1978
I 495 RAMP D NB over WATER CANOE RIVER
Built 1978
I 495 NB over WATER CANOE RIVER
Built 1978
HWY RESERVOIR ST over WATER RUMFORD RIVER
Built 1955
HWY PLAIN ST over I 495
Built 1980
Bridge Details
- Structure #
- N230143V0DOTNBI
- Year Built
- 1958
- Length
- 15.2 m (49.9 ft)
- Max Span
- 14.3 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 2
- Daily Traffic
- 10,786
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,683,000
- Total Project Cost
- $2,525,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.