HWY POWER ST over WATER BARROWSVILLE POND

.2 MI N OF S WORCESTER ST · County 005, Massachusetts · Built 1997 · 2 Lanes · 928 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
N230033LPMUNNBI
Year Built
1997
Length
17.1 m (56.1 ft)
Max Span
16.2 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
928
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,375,000
Total Project Cost
$2,063,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.