HWY HOLDEN ST over RR AMTRAK/MBTA

.2MI.N OF ST 123 · County 005, Massachusetts · Built 1962 · 2 Lanes · 19,138 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
A160203YYDOT634
Year Built
1962
Length
31.7 m (104 ft)
Max Span
18.1 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
19,138
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,366,000
Total Project Cost
$5,050,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.