HWY MECHANICS ST over WATER CANAL

.25 MI W OF RTE 152 · County 005, Massachusetts · Built 1921 · 2 Lanes · 3,620 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
A160733HXMUNNBI
Year Built
1921
Reconstructed
1997
Length
12.5 m (41 ft)
Max Span
10.9 m
Width
15.3 m (50.2 ft)
Lanes
2
Daily Traffic
3,620
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$588,000
Total Project Cost
$883,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.