HWY OLIVE ST over WATER TEN MILE RIVER

.1 MI SO OF ST 123 · County 005, Massachusetts · Built 1920 · 2 Lanes · 7,112 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
A160113HVMUNNBI
Year Built
1920
Reconstructed
1986
Length
11.9 m (39 ft)
Max Span
11.6 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
7,112
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$928,000
Total Project Cost
$1,393,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.