HWY LAMB ST over WATER TEN MILE RIVER

1.8MI E OF RT.95 · County 005, Massachusetts · Built 1905 · 2 Lanes · 4,571 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
A160123L2MUNNBI
Year Built
1905
Reconstructed
1993
Length
12.2 m (40 ft)
Max Span
10.4 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
4,571
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,115,000
Total Project Cost
$1,673,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.