HWY OLIVE ST over RR AMTRAK/MBTA

RR AMTRAK MP 196.72 · County 005, Massachusetts · Built 2013 · 2 Lanes · 6,077 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
A16025AMYDOT634
Year Built
2013
Length
50.6 m (166 ft)
Max Span
26.5 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
6,077
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,870,000
Total Project Cost
$5,806,000