ST 2 STATE RD over WATER NOTCH BROOK

JCT. W/BRAYTON HILL TERR. · County 003, Massachusetts · Built 1959 · 2 Lanes · 25,216 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
N140250AHDOTNBI
Year Built
1959
Length
7 m (23 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
25,216
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$129,000
Total Project Cost
$194,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.