HWY PROTECTION over WATER HOOSIC RIVER

500 N OF JCT W/RTE 2 · County 003, Massachusetts · Built 1950 · 2 Lanes · 1,681 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N1400401FMUNNBI
Year Built
1950
Reconstructed
2001
Length
41.8 m (137.1 ft)
Max Span
40.5 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
1,681
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$3,403,000
Total Project Cost
$5,105,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.