ST 8 A/HODGS CRSS over WATER S BR HOOSIC RIVER
0.2 MI E OF JCT W/ RTE 8 · County 003, Massachusetts · Built 1966 · 2 Lanes · 12,414 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.665169, -73.103908
This bridge is in worse condition than 64% of bridges in County 003. The average bridge in Massachusetts is 0 years old; this one is 60 years old.
Nearby Bridges
ST 8 A/CHURCH over WATER PHILLIPS CREEK
Built 1953
HWY LIME ST over WATER HOOSIC RIVER
Built 1998
HWY LIME ST over WATER NOTCH BROOK
Built 1998
HWY HRTG PRK DR over WATER HOOSIC RIVER
Built 1987
ST 8 STATE ST over COMB HOOSIC RIV & PARR
Built 1941
HWY COOK ST over WATER HOOSIC RIVER
Built 1957
ST 2 /ST8/UNION over WATER N BR HOOSIC RIVER
Built 1958
ST 2 /ST8/UNION over WATER N BR HOOSIC RIVER
Built 1956
HWY MAIN ST over WATER HOOSIC RIVER
Built 1959
ST 2 VTRNS MEM DR over COMB ST8 & HOOSIC RIV
Built 1959
Bridge Details
- Structure #
- N140190BQDOTNBI
- Year Built
- 1966
- Length
- 28.3 m (92.8 ft)
- Max Span
- 13.4 m
- Width
- 16.8 m (55.1 ft)
- Lanes
- 2
- Daily Traffic
- 12,414
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,163,000
- Total Project Cost
- $4,745,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.