HWY LIME ST over WATER NOTCH BROOK

.2 MI EAST OF ROUTE 8 · County 003, Massachusetts · Built 1998 · 2 Lanes · 1,571 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
A04018AQRMUNNBI
Year Built
1998
Length
9.9 m (32.5 ft)
Max Span
3.1 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
1,571
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$643,000
Total Project Cost
$965,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.