HWY HOOSAC&SUMER over WATER TOPHET BROOK

@ SUMMER & HOOSAC ST INT. · County 003, Massachusetts · Built 1941 · 2 Lanes · 6,857 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
A0403100EMUNNBI
Year Built
1941
Length
15.1 m (49.5 ft)
Max Span
15.1 m
Lanes
2
Daily Traffic
6,857
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,248,000
Total Project Cost
$1,873,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.