I 93 /US1/ST3 over HWY GRANITE AVE
1 MI S OF JCT193& NEP AVE · County 021, Massachusetts · Built 1956 · 8 Lanes · 99,184 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.274464, -71.050467
This bridge is in worse condition than 64.4% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 70 years old.
Nearby Bridges
I 93 /US1/ST3 over WATER NEPONSET RIVER
Built 1954
HWY GRANITE AVE over WATER NEPONSET RIVER
Built 1959
I 93 /US1/ST3 over HWY HALLET STREET
Built 1956
HWY CEDAR GROVE over TR RED HSL
Built 1935
HWY ADAMS ST over TR RED LINE MATT CONN
Built 1886
I 93 /US1/ST3 over OTHER PED/ BIKE PATH
Built 1956
HWY MEDWAY ST over TR RED HSL
Built 1928
I 93 /US1/ST3 over HWY THEATRE ACCESS RD
Built 1957
HWY SQUANTUM ST over I 93 /US1/ST3
Built 1954
I 93 /US1/ST3 over HWY NEP AV/GALV/MRSY
Built 1955
Bridge Details
- Structure #
- M250173B2DOTNBI
- Year Built
- 1956
- Reconstructed
- 1986
- Length
- 44.2 m (145 ft)
- Max Span
- 21.6 m
- Width
- 39 m (128 ft)
- Lanes
- 8
- Daily Traffic
- 99,184
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,394,000
- Total Project Cost
- $17,092,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.