I 93 /US1/ST3 over HWY NEP AV/GALV/MRSY

4.4 MI S OF JCT I90&I93 · County 025, Massachusetts · Built 1955 · 8 Lanes · 173,365 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B162513D5DOTNBI
Year Built
1955
Reconstructed
1984
Length
364.8 m (1196.9 ft)
Max Span
27.4 m
Width
36 m (118.1 ft)
Lanes
8
Daily Traffic
173,365
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$85,305,000
Total Project Cost
$127,958,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.