ST 3 A/MORRSY BLV over COMB NEPONSET AVE&RIVER

.2 MI E OF I 93 · County 025, Massachusetts · Built 1970 · 6 Lanes · 76,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B163904F7DOTNBI
Year Built
1970
Reconstructed
2012
Length
310.3 m (1018 ft)
Max Span
53.6 m
Width
30.1 m (98.8 ft)
Lanes
6
Daily Traffic
76,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$60,773,000
Total Project Cost
$91,160,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.