I 93 /US1/ST3 over HWY HALLET STREET
4.8 MI S OF JCTI90&I93 · County 025, Massachusetts · Built 1956 · 6 Lanes · 190,508 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.280403, -71.046431
This bridge is in worse condition than 24.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 70 years old.
Nearby Bridges
HWY CEDAR GROVE over TR RED HSL
Built 1935
I 93 /US1/ST3 over WATER NEPONSET RIVER
Built 1954
I 93 /US1/ST3 over OTHER PED/ BIKE PATH
Built 1956
I 93 /US1/ST3 over HWY THEATRE ACCESS RD
Built 1957
HWY GRANITE AVE over WATER NEPONSET RIVER
Built 1959
I 93 /US1/ST3 over HWY NEP AV/GALV/MRSY
Built 1955
ST 3 A/MORRSY BLV over COMB NEPONSET AVE&RIVER
Built 1970
I 93 /US1/ST3 over HWY GRANITE AVE
Built 1956
ST 3 A/HNCK OFFRP over OTHER RELIEF
Built 1970
ST 3 A/HANCK ONRP over OTHER RELIEF
Built 1970
Bridge Details
- Structure #
- B162533D2DOTNBI
- Year Built
- 1956
- Reconstructed
- 1986
- Length
- 18.2 m (59.7 ft)
- Max Span
- 16.6 m
- Width
- 36.1 m (118.4 ft)
- Lanes
- 6
- Daily Traffic
- 190,508
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $891,000
- Total Project Cost
- $1,337,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.