HWY GRANITE AVE over WATER NEPONSET RIVER

MILTON TOWN LINE · County 025, Massachusetts · Built 1959 · 4 Lanes · 39,339 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B160223A3DOTNBI
Year Built
1959
Length
57 m (187 ft)
Max Span
19.8 m
Width
15.5 m (50.9 ft)
Lanes
4
Daily Traffic
39,339
Material
Steel
Design
Movable - Bascule
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,837,000
Total Project Cost
$8,756,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.