I 93 /US1/ST3 over WATER NEPONSET RIVER

.8 KM S OF JCT SR 3A · County 025, Massachusetts · Built 1954 · 8 Lanes · 169,936 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B162503D1DOTNBI
Year Built
1954
Reconstructed
1984
Length
145.7 m (478 ft)
Max Span
44.2 m
Width
36 m (118.1 ft)
Lanes
8
Daily Traffic
169,936
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$34,122,000
Total Project Cost
$51,184,000