I 93 /US1/ST3 over WATER NEPONSET RIVER
.8 KM S OF JCT SR 3A · County 025, Massachusetts · Built 1954 · 8 Lanes · 169,936 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.277783, -71.0484
This bridge is in worse condition than 55.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 72 years old.
Nearby Bridges
I 93 /US1/ST3 over HWY HALLET STREET
Built 1956
HWY CEDAR GROVE over TR RED HSL
Built 1935
HWY GRANITE AVE over WATER NEPONSET RIVER
Built 1959
I 93 /US1/ST3 over HWY GRANITE AVE
Built 1956
I 93 /US1/ST3 over OTHER PED/ BIKE PATH
Built 1956
I 93 /US1/ST3 over HWY THEATRE ACCESS RD
Built 1957
HWY ADAMS ST over TR RED LINE MATT CONN
Built 1886
I 93 /US1/ST3 over HWY NEP AV/GALV/MRSY
Built 1955
ST 3 A/MORRSY BLV over COMB NEPONSET AVE&RIVER
Built 1970
ST 3 A/HNCK OFFRP over OTHER RELIEF
Built 1970
Bridge Details
- Structure #
- B162503D1DOTNBI
- Year Built
- 1954
- Reconstructed
- 1984
- Length
- 145.7 m (478 ft)
- Max Span
- 44.2 m
- Width
- 36 m (118.1 ft)
- Lanes
- 8
- Daily Traffic
- 169,936
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $34,122,000
- Total Project Cost
- $51,184,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.