HWY REDFIELD ST over COMB MBTA&REDS&FRKLN ST

OVER RED LINE · County 025, Massachusetts · Built 1955 · 2 Lanes · 700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B161374VNMBTNBI
Year Built
1955
Reconstructed
2004
Length
26 m (85.3 ft)
Max Span
25.5 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
700
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$745,000
Total Project Cost
$1,118,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.