HWY SQUANTUM ST over I 93 /US1/ST3

2.4 KM S OF JCT I93&SR3A · County 021, Massachusetts · Built 1954 · 2 Lanes · 19,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
M250183FBDOTNBI
Year Built
1954
Length
45.7 m (149.9 ft)
Max Span
21.9 m
Width
16.6 m (54.5 ft)
Lanes
2
Daily Traffic
19,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,958,000
Total Project Cost
$7,438,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.