I 90 EX 94 INT 10 over I 90
.3 MI W. ROUTE 146 · County 027, Massachusetts · Built 1997 · 2 Lanes · 12,748 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.207342, -71.787578
This bridge is in worse condition than 30.9% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 29 years old.
Nearby Bridges
HWY GREENWOOD AV over I 90
Built 1997
HWY GREENWOOD ST over WATER DIVERSON CHANNEL
Built 1957
I 90 over COMB I-90RMP-CANAL-PWRR
Built 1997
I 90 over WATER BLACKSTONE RIVER
Built 1957
US 20 CONNECTOR over COMB PWRR & BLKSTN RIV
Built 1996
I 90 WB over ST146
Built 1997
I 90 EB over ST146
Built 1997
US 20 CONNECTOR over ST146
Built 1996
US 20 EB over COMB ST146&PWRR&BLKSTN
Built 2005
US 20 WB over COMB ST146&PWRR&BLKSTN
Built 2005
Bridge Details
- Structure #
- M220458G6DOTNBI
- Year Built
- 1997
- Length
- 67.4 m (221.1 ft)
- Max Span
- 33.9 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 2
- Daily Traffic
- 12,748
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,099,000
- Total Project Cost
- $10,649,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.