HWY GREENWOOD ST over WATER DIVERSON CHANNEL
.1 MI S OF I- 90 · County 027, Massachusetts · Built 1957 · 2 Lanes · 4,326 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.205294, -71.787717
This bridge is in worse condition than 30.9% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
HWY GREENWOOD AV over I 90
Built 1997
I 90 EX 94 INT 10 over I 90
Built 1997
I 90 over COMB I-90RMP-CANAL-PWRR
Built 1997
I 90 over WATER BLACKSTONE RIVER
Built 1957
US 20 CONNECTOR over COMB PWRR & BLKSTN RIV
Built 1996
I 90 WB over ST146
Built 1997
I 90 EB over ST146
Built 1997
HWY MCCRACKEN RD over HWY LUMBER YARD ACCESS
Built 1998
US 20 CONNECTOR over ST146
Built 1996
I 90 over WATER DIVERSION CHANNEL
Built 1957
Bridge Details
- Structure #
- M220271CPMUNNBI
- Year Built
- 1957
- Reconstructed
- 2012
- Length
- 21.7 m (71.2 ft)
- Max Span
- 20 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 4,326
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,474,000
- Total Project Cost
- $2,212,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.