HWY GREENWOOD ST over WATER DIVERSON CHANNEL

.1 MI S OF I- 90 · County 027, Massachusetts · Built 1957 · 2 Lanes · 4,326 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
M220271CPMUNNBI
Year Built
1957
Reconstructed
2012
Length
21.7 m (71.2 ft)
Max Span
20 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
4,326
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,474,000
Total Project Cost
$2,212,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.