HWY GREENWOOD AV over I 90

I-90 MM 93.57 · County 027, Massachusetts · Built 1997 · 2 Lanes · 4,326 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
M220338RUDOTNBI
Year Built
1997
Length
84 m (275.6 ft)
Max Span
31.6 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
4,326
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,642,000
Total Project Cost
$8,464,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.