US 20 EB over COMB ST146&PWRR&BLKSTN

.3 MI S OF WORC T/L · County 027, Massachusetts · Built 2005 · 2 Lanes · 11,554 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
M2204687BDOTNBI
Year Built
2005
Length
309.7 m (1016.1 ft)
Max Span
48.8 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
11,554
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,246,000
Total Project Cost
$10,870,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.