I 90 over COMB I-90RMP-CANAL-PWRR

.2 MI W. ROUTE 146 · County 027, Massachusetts · Built 1997 · 9 Lanes · 91,703 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
M220308RTDOTNBI
Year Built
1997
Length
80.1 m (262.8 ft)
Max Span
29.5 m
Width
44.4 m (145.7 ft)
Lanes
9
Daily Traffic
91,703
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,670,000
Total Project Cost
$7,006,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.