US 20 CONNECTOR over ST146

.1 MI S OF US-20 · County 027, Massachusetts · Built 1996 · 4 Lanes · 24,616 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
M22047AFJDOTNBI
Year Built
1996
Length
39.9 m (130.9 ft)
Max Span
37.5 m
Width
25.3 m (83 ft)
Lanes
4
Daily Traffic
24,616
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$657,000
Total Project Cost
$986,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.