I 93 over HWY RIVERSIDE DR
AT MERRIMAC RIVER · County 009, Massachusetts · Built 1959 · 8 Lanes · 133,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.702194, -71.210106
This bridge is in worse condition than 17.7% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 67 years old.
Nearby Bridges
I 93 over WATER MERRIMACK RIVER
Built 1959
I 93 over ST110 /ST113/LOWELL ST
Built 2017
HWY FOREST ST over I 93
Built 1959
HWY RIVER RD over I 93
Built 2001
HWY CHANDLER RD over I 93
Built 1959
HWY OAKLAND AVE over TR METHUEN RAIL TRAIL
Built 1936
I 93 over HWY PELHAM ST
Built 1959
ST 28 BROADWAY over WATER SPICKET RIVER
Built 1900
ST113 LOWLL & OSGD over TR METHUEN RAILTRAIL
Built 1983
ST 28 BROADWAY over WATER SPICKET RIVER
Built 1850
Bridge Details
- Structure #
- M170072UPDOTNBI
- Year Built
- 1959
- Reconstructed
- 1975
- Length
- 95.1 m (312 ft)
- Max Span
- 25.3 m
- Width
- 43.5 m (142.7 ft)
- Lanes
- 8
- Daily Traffic
- 133,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,423,000
- Total Project Cost
- $8,135,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.