I 93 over HWY RIVERSIDE DR

AT MERRIMAC RIVER · County 009, Massachusetts · Built 1959 · 8 Lanes · 133,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
M170072UPDOTNBI
Year Built
1959
Reconstructed
1975
Length
95.1 m (312 ft)
Max Span
25.3 m
Width
43.5 m (142.7 ft)
Lanes
8
Daily Traffic
133,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,423,000
Total Project Cost
$8,135,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.