ST113 LOWLL & OSGD over TR METHUEN RAILTRAIL

.32 KM W ST28 · County 009, Massachusetts · Built 1983 · 5 Lanes · 28,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
M1700632HDOT634
Year Built
1983
Length
13.7 m (44.9 ft)
Max Span
13.1 m
Width
49.5 m (162.4 ft)
Lanes
5
Daily Traffic
28,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,499,000
Total Project Cost
$6,749,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.