ST 28 BROADWAY over WATER SPICKET RIVER

.9 MI S ST213 · County 009, Massachusetts · Built 1850 · 2 Lanes · 13,010 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
M170012YLDOTNBI
Year Built
1850
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Width
20.1 m (65.9 ft)
Lanes
2
Daily Traffic
13,010
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,175,000
Total Project Cost
$1,763,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.