HWY DAISY ST over WATER SPICKET RIVER

1.4 KM E ST28 · County 009, Massachusetts · Built 1939 · 2 Lanes · 3,202 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
L040082Q0MUNNBI
Year Built
1939
Length
16.3 m (53.5 ft)
Max Span
16.3 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
3,202
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,435,000
Total Project Cost
$2,153,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.