ST213 EB over TR METHUEN RAIL TRAIL

.2 MI W ST28 · County 009, Massachusetts · Built 1959 · 2 Lanes · 32,821 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
M170262RWDOTNBI
Year Built
1959
Length
8.8 m (28.9 ft)
Max Span
7.9 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
32,821
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,898,000
Total Project Cost
$2,848,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.