I 93 over ST213 WB
2.3 MI N MERRIMAC RIVER · County 009, Massachusetts · Built 1959 · 7 Lanes · 186,800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.735128, -71.203614
This bridge is in worse condition than 39.1% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 67 years old.
Nearby Bridges
ST213 WB over WATER SPICKET RIVER
Built 1959
I 93 over ST213 EB
Built 1959
ST213 EB over WATER SPICKET RIVER
Built 1959
I 93 over WATER HARRIS BROOK
Built 1959
ST213 WB over TR METHUEN RAIL TRAIL
Built 1959
I 93 over HWY PELHAM ST
Built 1959
ST213 EB over TR METHUEN RAIL TRAIL
Built 1959
HWY HAMPSHIRE RD over WATER SPICKET RIVER
Built 1959
I 93 over HWY HAMPSHIRE RD
Built 1959
ST 28 BROADWAY over ST213
Built 2011
Bridge Details
- Structure #
- M170232UVDOTNBI
- Year Built
- 1959
- Reconstructed
- 1974
- Length
- 39.9 m (130.9 ft)
- Max Span
- 14.9 m
- Width
- 42.7 m (140.1 ft)
- Lanes
- 7
- Daily Traffic
- 186,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,089,000
- Total Project Cost
- $16,634,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.