I 93 over HWY PELHAM ST

1.8 MI N MERRIMAC RIVER · County 009, Massachusetts · Built 1959 · 10 Lanes · 72,473 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
M170202UTDOTNBI
Year Built
1959
Reconstructed
1974
Length
37.5 m (123 ft)
Max Span
17.1 m
Width
65 m (213.3 ft)
Lanes
10
Daily Traffic
72,473
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,036,000
Total Project Cost
$24,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.