I 93 over ST213 EB

2 MI N MERRIMAC RIVER · County 009, Massachusetts · Built 1959 · 6 Lanes · 144,946 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
M170212UUDOTNBI
Year Built
1959
Reconstructed
1974
Length
34.1 m (111.9 ft)
Max Span
12.8 m
Width
45.1 m (148 ft)
Lanes
6
Daily Traffic
144,946
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,248,000
Total Project Cost
$15,373,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.