HWY RIVER RD over I 93
.5 MILES SOUTH MERRIMAC R · County 009, Massachusetts · Built 2001 · 6 Lanes · 14,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.690583, -71.206389
This bridge is in worse condition than 17.7% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 25 years old.
Nearby Bridges
I 93 over WATER MERRIMACK RIVER
Built 1959
I 93 over HWY RIVERSIDE DR
Built 1959
HWY CHANDLER RD over I 93
Built 1959
I 93 over ST110 /ST113/LOWELL ST
Built 2017
HWY FOREST ST over I 93
Built 1959
HWY GREENWOOD RD over I 495 SB
Built 1962
HWY CHANDLER RD over I 495 SB
Built 1962
HWY GREENWOOD RD over I 495 NB
Built 1962
HWY CHANDLER RD over I 495 NB
Built 1962
I 495 SB over I 93
Built 1961
Bridge Details
- Structure #
- A09029AU5DOTNBI
- Year Built
- 2001
- Length
- 67.6 m (221.8 ft)
- Max Span
- 33.8 m
- Width
- 28.3 m (92.8 ft)
- Lanes
- 6
- Daily Traffic
- 14,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,133,000
- Total Project Cost
- $6,200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.