I 93 over WATER MERRIMACK RIVER

AT MERRIMAC RIVER · County 009, Massachusetts · Built 1959 · 8 Lanes · 119,818 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
A090222V0DOTNBI
Year Built
1959
Reconstructed
1975
Length
236.2 m (774.9 ft)
Max Span
53.3 m
Width
43.5 m (142.7 ft)
Lanes
8
Daily Traffic
119,818
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$81,426,000
Total Project Cost
$122,140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.