HWY CHANDLER RD over I 495 SB

CHANDLER RD AT I-495 · County 009, Massachusetts · Built 1962 · 2 Lanes · 6,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

42.672089, -71.181514

This bridge is in worse condition than 39.1% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 64 years old.

Nearby Bridges

Bridge Details

Structure #
A09033303DOTNBI
Year Built
1962
Length
46.2 m (151.6 ft)
Max Span
22.1 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
6,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,547,000
Total Project Cost
$6,821,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.